Sint Servaasbrug in operation again from Monday

From Monday (20 March), the movable part of the Sint Servaasbrug will no longer be continuously in a raised position. From noon onwards, this part of the vertical lift bridge will be in operation again.

The bridge has been held in a raised position for several weeks. This is because the Julianakanaal is blocked between the lock in Born and the port of Stein, causing great inconvenience to shipping. Ships had to detour. This has now been resolved.

The bridge will now be operated daily again, between 07:00-19:00. It will not be operated in the evening and night hours, as the camera images used by employees can only be used in daylight.